Note: The underlay cannot be used without suitable hardware. You can find the appropriate hardware under "Additional hardware required".
These documents consist of the following experiment instructions:
- Experiment instructions "Electrical safety measures"
- Instructions for handling the SAFETY BOARD
- Protection against direct and indirect contact
- Safety through protective extra-low voltage
- Autotransformer
- Overcurrent protection devices
- Summation current transformer
- Residual-current device
- Protective measures in the TN system
- Protective measures in the TT system
- Measuring the earth resistance
- Protective measures in the IT system
- Protective insulation
- Protective separation
- Earth electrode
Incl. solutions
- Experiment instructions "Basic circuits of installation technology"
Introduction to domestic installation technology
- Circuit symbols of installation technology
- Power lines
- Types of circuit diagrams
- The safe handling
Basic circuits of domestic installation technology
- Switching off with a circuit breaker
- Switching off with a circuit breaker and socket
- Switching off with dimmer and socket
- Changeover circuit
- Changeover circuit with socket outlet
- Economy changeover with socket
- Cross connection
- Cross connection with socket
- Impulse circuit with push-buttons
- Staircase timer
- Exterior lighting with automatic switch
Incl. solutions
- Electronics technician in automation technology
- Electronics technician for industrial engineering
- Mechatronics technician
- Electronics technician for buildings and infrastructure systems
- Electronics technician for energy and building services engineering
- Electronics technician for machines and drive technology
- Electrical systems technician
- Electronics technician for devices and systems
- Electronics technician for information and systems technology
- Industrial electrician for industrial engineering
- Industrial electrician, devices and systems
You will find the individual experiment instructions with detailed information on the respective learning objectives under "Scope of delivery/individual parts".
Experiment instructions incl. CD-ROM and solutions